Schooner Bar – Ram Quarter
Case Study
Project specifications
This job was carried out at the Schooner Bar at Ram Quarter, 13 Barley Walk, London SW18 1UL.
At the Schooner Bar, we installed a light natural polished concrete floor to enhance its ambiance. The light natural finish was chosen for its subtle elegance, complementing the bar’s atmosphere with a modern aesthetic that blends seamlessly into the surroundings.
In addition to the flooring, we meticulously installed and formed two matwells, integrating them seamlessly into the concrete surface. The entire floor was power floated to achieve a smooth satin finish, adding a touch of sophistication to the bar’s interior. This project showcases our expertise in delivering polished concrete solutions that not only meet aesthetic goals but also enhance functionality and durability.











